The landlord had a tired town centre office building. The internal layout although usable needed a full cosmetic and utility upgrade. The building is now let to a hi-tech computer business
The internal fabrics of the building were stripped out. New risers and conduits were constructed and the fabrics replaced providing a new lease of life.
A village school needed a classroom extension and cosmetic replacement. The thermal properties needed upgrading to comply with current council targets
When working to a tight deadline on a commercial building we had to think outside the box to permit working irrespective of the UK weather
Community centre needed partially demolishing and the roof replaced. The challenges were to overcome the inherent surprises of a 75 year old building
A workshop at a training facility for the retail motor industry. Floor pits had to be dug, electrical installations uprated and lighting improved
A lecture theatre at a training facility. In order to be flexible we installed retractable accoustic dividing walls to allow the room to accomodate small or large groups of people
For this project, the challenge was to build a dwelling in a land bank that was structurally sound, fully building regs compliant and the client could not see the land behind
Roof top work to strengthen the structure to support the weight of new air conditioning equipment and perimeter acoustic barriers
New Paragraph
All Rights Reserved | Crimson Contractors are part of the Crimson Group of companies | The word 'crimson' is a registered trademark